Measure C - 2024 Bond
current projects
Burchfiled Primary SChool
There are two (2) current bond projects underway. At the Burchfield Primary School, a new TK/K modular classroom wing is being developed. The new classroom wing will include eight (8) classrooms the meet the current California Department of Education recommendations for size and amenities inside the classroom. The classroom wing will also have a new age-appropriate play structure added as well as circulation space between the buildings. Burchfield Primary School will also get a new seven (7) classroom wing for the 2nd and 3rd grade side of the campus. The classroom wing will have standardized classrooms as well as restroom facilities at the end of the wing. This will add much needed restrooms to the 2nd and 3rd grade side of the campus.
egling middle school
Ballot Measure Documents and Information
- Remove hazardous materials like asbestos and lead pipes from older school sites, where encountered
- Provide classroom and facilities with technology needed to support high quality instruction in math, science, engineering, and technology
- Update or replace safety and security systems
- Improve access for students with disabilities
- Repair or replace deteriorating roofs, windows and old plumbing, sewer, heating, ventilation, and electrical systems
- A detailed project list indicating projects that could be funded with Board of Education approval
- Public disclosures of all spending would be required
- A citizens’ oversight committee and independent audits would be required
- All money raised by the measure would be controlled locally and could not be taken by the State
- We want to hear from you! Take our survey HERE.
- Queremos saber su opinión! Responda a nuestra encuesta AQUÍ
- Fact Sheet HERE
- Hoja informativa AQUÍ
- Frequently Asked Questions HERE
- Preguntas frecuentes AQUÍ
- Community Mailer
- Correo Comunitario